1. Floor done No seat boards yet. |
|
|
|
|
|
|
|
|
|
|
|
|
2. New steel floor plates were fabricated to go around and mount Emergency brake and main brake lever. Also shifter stick. Normal tranny. three speeds forward and one reverse. |
|
|
|
|
|
|
|
|
|
|
|
|
3. New oak seat boards primed and painted and ready to be installed. |
|
|
|
|
|
|
|
|
|
|
|
|
4. Floor done Seats done. |
|
|
|
|
|
|
|
|
|
|
|
|
5. ready for roof boards. |
|
|
|
|
|
|
|
|
|
|
|
|
6. Installing new roof boards. Worker is 6' 4" tall |
|
|
|
|
|
|
|
|
|
|
|
|
7. Installing last new oak roof board. All painted with 2 part epoxy to match old color. |
|
|
|
|
|
|
|
|
|
|
|
|
8. New seat boards and new roof boards Old door but with old fashioned lock and keys. The kind that cannot be duplicated. |
|
|
|
|
|
|
|
|
|
|
|
|
|
10. Front end being lifted up to install the temporary blue steel support in preparation for installation of front axle / springs / wheels. |
|
|
|
|
|
|
|
|
|
|
|
|
11. Ready for front wheels |
|
|
|
|
|
|
|
|